Machines | Willians Hill Miniature Railway (Wagga Wagga) Spiral - Jun 2016
videos | at work | information | view | construction
This is the progress of the spiral of the miniature railway (video taken 19-Jun-2016). About another 120m of track to join the lower main loop to the spiral track. 00:00 Starts with train running on the spiral (train was reversed into the spiral). 00:47 The new bridge 01:03 Switching points to the Museum loop (on left) Video showing the centre of the spiral - lovely pool of water (with ducks swimming) from the rain that Wagga has received 01:40 Joining back the Main loop
Comments
-
An earlier video showing the starting of the loop [https://www.youtube.com/watch?v=w0YWGnPCZiQ] being constructed in April 2016.
https://www.youtube.com/watch?v=veTCwr5uUbI