This is the progress of the spiral of the miniature railway (video taken 19-Jun-2016). About another 120m of track to join the lower main loop to the spiral track. 00:00 Starts with train running on the spiral (train was reversed into the spiral). 00:47 The new bridge 01:03 Switching points to the Museum loop (on left) Video showing the centre of the spiral - lovely pool of water (with ducks swimming) from the rain that Wagga has received 01:40 Joining back the Main loop