Well the auxiliary valve got fixed so I could use the tilt bucket which is my preferred bucket. So in this video I'm loading out some of the rip rap which was stockpiled nearby so the municipality could decide what to do with it. I couldn't help the mud getting mixed in but the rip rap was two to three feet deep in places, however I did save some of the rip rap for a later job that you'll see in another video.