Glade Run Lake dam on a warm(!) day in February. Lots of progress on the spillway. Starting to think about dredging channels at the east end of the lake, but a short experimental attempt to move some heavy equipment out there proved the need for a more stable path, probably made with some of the rip-rap from the old demolished dam. Stay tuned. Today was windy at just about the limit of the quadcopter - although the camera gimbal does a great job, you can see some bounciness in the picture when gusts hit the aircraft. at about 2:15 and just before 3:00, you can see a little bit of the left landing gear in the lower left corner as the aircraft fights to stay in commanded position.